The MFE aluminium formwork system is used globally for forming cast-in-place complete reinforced concrete structures to high quality standards and to achieve rapid construction cycles.

Using our aluminium formwork solutions, all building components can be cast in a single operation

Walls Floor slabs Columns & Beams Stairs Balconies

Door and window openings are also incorporated

  • The resulting structure is extremely strong and highly accurate in its dimensions and tolerances.
  • Achieves a high quality surface finish with only minimum "skim coat" required for final surface finishing.
  • MFE is able to dramatically increase the spend of construction with a 4-5 day per floor construction cycle average.

MFE FORMWORK SYSTEM
BENEFITS

Reusable

MFE Formwork can be used 300 - 500 times so ROI is maximised with multiple projects.

Lightweight

Average weight is only 23 - 25 kg M2 so no heavy lifting or cranes are required.

Simple to use

Can be assembled with non-skilled labour with simple training and no special tools required.

Fast build cycles

Typical cycle time of 1 floor every 4-5 days or 1 single storey house a day are achieved with MFE Formwork solutions.

Fully recyclable

Aluminium formwork is 100% recyclable at the end of its usability.

Reduce site rubbish

Constant reuse keeps the construction clean, safe and tidy.

Design flexibility

MFE design team are highly experienced in designing formwork solutions for multiple types of building and applications.

Strength & Stability

High load bearing capacity of up to 60 KN per M2 when assembled.

Finish quality

Achieves a high quality finish after formwork removal with only minimum "skim" coat required and no heavy plastering.

Meets Singapore CONQUAS standards.

Low carbon emissions

Countries starting to stipulate that wooden formwork cannot be used as formwork must be reusable.

Reduce building costs

Substantial direct and indirect building cost reduction is achieved with MFE aluminium formwork solutions.

FAST BUILDCYCLE
AND
DESIGN

Our formwork solutions enable rapid construction cycles using a "Production Line" process approach for each key task.

1
Install Wall Steel
2
1st Fix M&E
3
Fix wall and slab formwork
4
Install Slab Steel
5
Concrete Pour
6
Formwork Stripping

Implementing daily work cycles is the key to achieving high productivity levels

Typically 4 - 5 day per floor build cycles are achieved.

Double or single storey home build cycle of 1 house per day can be achieved.