MFE’s new self-climbing safety platform is in action in the center of Kuala Lumpur on the 32 storey Tong Ah Tower development with our customer and main contractor for the project Pembinaan Tuju Setia.
With three working levels, the platform is providing an ultra-safe exterior working environment for the construction team.
Secure enclosures also minimise the risk of items being dropped with vertical and horizontal sealing, even during the lifting operation.
Post Tensioning operations are optimised with the multiple working levels being ideal for tensioning operations and maximising efficient cycle times.